Return
Location:
Portland, ME
Completed:
2020

IMT Wharf Infill and Building Removal

Scope of Work

Cianbro handled the demolition of the maintenance building followed by the removal of pavement surrounding the building. Timber piles were removed where the building sat on pile bents. The seawall and curbs surrounding the area of the wharf to be infilled were saw cut and removed. Pipe piles were driven and concrete pile caps were installed. Precast deck planks were set on top of the pile caps, an approach slab and storage slab was placed, and a CIP deck was then placed over the precast deck planks. Fine Grading and paving was completed in the surrounding area. 

Project Details
  • Building demolition
  • Epoxy concrete deck sealing
  • Timber pile removal
  • Pipe pile driving
  • Concrete pile cap installation
  • Precast concrete deck panel installation
  • Bidwell concrete deck placing
  • Electrical power stand installation and lighting relocation
  • Concrete pier patching
Lean, Innovative and Unique Project Solutions

The project required a design for a lifting frame for setting of precast deck panels. The project also required a fabricated wheel to be used to install a backer rod along with a grout sled to grout the precast deck panel shear keys. 

 

No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.