Cianbro replaced two double-circuit lattice towers and transmission line on a 115 kV / 34.5 kV section of the transmission line over a major river. The existing towers were replaced by two new 240-foot lattice towers and four monopole dead-end structures on an offset centerline and were reconnected back into their respective and existing lines.
Challenges the project team encountered on this project include unpredictable Maine winter weather, the logistical coordination between the two work sites (hour-long driving distance), access and terrain due to the topography along the river bank, and completing a majority of the work on the grounds of a fully-functioning private school.