Scope of Work
Cianbro constructed a new campus-wide distribution system of normal and emergency medium-voltage electrical power, information technology (IT), and communication systems.
Project Details
- Installed two new incoming 12,470-volt utility feeders from Bangor Hydro Electric Company
- Installed over 47,000 linear feet of concrete-encased underground electrical, IT, and communications duct bank
- Constructed new normal power switchgear building
- Renovated the emergency power switchgear room
- Installed new 12,470-volt normal and emergency electrical switchgear, mimic, and remote monitoring panels
- Constructed two 15 by 36 electrical substations, IT, and communications vaults
- Installed two new 12,470-volt electrical substations
- Installed new co-generation gas turbine generator controls and power management system
- Installed new IT and communications network components
- Installed and terminated new copper and fiber IT and communications cable
- Re-fed existing campus substations, IT, and communications hubs
- Tested and commissioned new equipment and systems
- Performed cut-overs and energized the new system
Lean, Innovative and Unique Project Solutions
The project was constructed on an active, acute care hospital campus with numerous physical and logistical constraints requiring ongoing daily coordination of all construction operations with EMMC staff. Coordination included site circulation, parking needs, and detailed Interim Life Safety Measures (ILSM) and Infection Control Risk Assessment (ICRA) protocols. Each construction activity was scrutinized to minimize impact to hospital operations and ensure the safety and comfort of patients, visitors, and guests.