Sorenson-Deer Creek 138kV BOLD® Project Earns Top Honors

Sorenson-Deer Creek 138kV BOLD® Project Earns Top Honors

In 2020, Cianbro completed its first-ever 138kV BOLD® (Breakthrough Overhead Line Design) double circuit transmission line for American Electric Power (AEP). On the first day of the Sorenson-Deer Creek 138 kV BOLD® Transmission Line Rebuild Project, the team agreed that the path to a safe and successful outcome was through collaboration and effective communication, and it paid off. In September, Engineering News-Record (ENR) Midwest awarded Cianbro with the Best Project in the Specialty Construction category for this project. 

The project covered 35 miles from Huntington to Marion, Indiana. The scope of work included:

  • Installing, maintaining, and removing more than 35 miles of access roads, work pads, right-of-way (ROW), and environmental controls. 
  • Installing 215 steel BOLD® transmission structures on drilled concrete foundations, and 35 miles of double-circuit single conductor including shield and optical ground wire. 
  • Removing 199 steel lattice towers and 35 miles of existing conductor and shield wire.

This project's success has led to additional opportunities with AEP, including the Deer Creek-Wes Del 138kV BOLD® Transmission Line Project in Indiana, which began in July 2020 and includes approximately 20 miles of transmission line rebuild.

ENR’s annual awards program honors the best construction projects and the companies. ENR bases its award on how a project performs in the following areas: 

  • Overcoming challenges and teamwork
  • Safety 
  • Innovation and contribution to the industry/community 
  • Construction quality and craftsmanship 
  • Functionality of design and aesthetic quality 

Congratulations to the Power & Energy team on this honor!

Related

Tags

Share

 

 

 

 

 

 

 
Cianbro Chatter

Cianbro Chatter - 2019

Cianbro Chatter - Spring/Summer 2018

Cianbro Chatter - Fall/Winter 2017

Cianbro Chatter - Spring/Summer 2017

Chatter Fall/Winter 2016

Chatter Spring-Summer 2016

Chatter Fall-Winter 2015

Chatter Fall-Winter 2014

Chatter Spring-Summer 2015

Cianbro Chatter Spring-Summer 2014

Chatter Fall - Winter 2013

Chatter Spring-Summer 2013

Cianbro Chatter - Summer Fall 2012

Cianbro Chatter-Spring 2012

Cianbro Chatter Fall-winter 2012

Cianbro Chatter - Spring/Summer 2011

Cianbro Videos

Meet Our Interns - Morgan

Delivering Cianbro Modules Aboard the Emma Foss

Taking the Hump out of the Humpback Bridge

Black Bear Tissue Machines - Two Steps Forward for St. Croix Tissue

Meet Our Interns - John

Sarah Long Bridge: The Span Springs into Public View

Oxford Casino Expansion Project: Going Vertical With a New Hotel

PAR Electric Transmission Towers: Putting the MLC650 to the Test

Cianbro Opens Maine's Largest Solar Array

Meet Our Interns - Genna

Meet Our Interns - Riley