Scope of Work
Cianbro completed the circuit tie project including pole sets, reconductoring, conversion and circuit tie's with three (3) other circuits.
Project Details
- Installed 116 poles and 50 anchors
- Installed 2.5 miles of 3 phase spacer cable
- Replaced 53 transformers
- Installed 2 - load break switches
- Demolished the existing primary and neutral