Scope of Work
Cianbro rehabilitated four sedimentation basins within an operating water treatment facility.

Project Details
  • Demolished and replaced mechanical flocculation and sludge collection equipment
  • Repaired existing reinforced concrete basins
  • Repaired and replaced valves and flow control gates
  • Replaced flushing water system
  • Replaced wooden flow baffles with fiberglass baffles
  • Constructed a 50-ft by 10-ft masonry building to house new flocculator drives and motor control centers
  • Rehabilitated the electric power distribution system
  • Constructed access road with curb and gutter systems
  • Installed lighting system
  

Unique Challenge



Working in cooperation with the City and their engineer, the Cianbro team refurbished the sedimentation basins in phases, and successfully maintained the plant’s capacity to process continuous water flows.

Project Information

Owner:
City of Baltimore

Type of Project:
Industrial

Construction Schedule:
Completed April 2002

Location:
Baltimore, MD