Inspection & Collector Repairs

Location:
Withheld Upon Owner Request
Completed:
2014

Scope of Work

Cianbro visually inspected 27 miles of 115 kV transmission line. The project involved miscellaneous repairs to the above ground collector system between the wind turbine units.

Project Details

  • Visually inspected 30 miles of 115 kV transmission line 
  • Recorded observations and took photos at each structure 
  • Recommended repairs
  • Performed inspection on ATV or foot
  • Performed repairs from a 75 ft road bucket on the WTG collector system, including tree removal, guy repositioning, and reattaching bonds

Lean, Innovative, and Unique Project Solutions

During the inspections, traversing through the right-of-way was extremely difficult, because most areas had not been improved upon in many years so the undergrowth was thick. The rough travel required walking by foot or the use of ATV’s. It was crucial to communicate between inspection teams to ensure preparedness for the emergencies in the wilderness.