Niantic River Bascule Bridge Replacement

Location:
East Lyme & Waterford, CT
Completed:
2013

The Construction Manager was URS Corporation.

Scope of Work

The Cianbro/Middlesex Joint Venture Team constructed a new two-track, electrified railroad bascule bridge across the Niantic River 58 ft south of its present location. 

Project Details

  • Demolished/removed the existing bridge and associated piers and abutments
  • Installed a new reinforced HDPE fender system with eight, 78” diameter by 40’ FRP mono piles and 57, 14” diameter by 40’ FRP piles
  • Expanded navigational channel beneath the bridge from 45 to 100 ft and increased the vertical under-clearance above the water from 11.5 to 16 ft
  • Constructed in-water cofferdams for 21.5-ft thick tremie footings
  • Erected over 1,400 tons of structural steel, including two, 13-ft tall, 106- ton approach girders and two, 141-ton bascule heel girders
  • Floated-in the new single leaf bascule span and jacked for placement
  • Installed 7,600 ft of overhead 25 kV catenary traction power system
  • Installed new electrical control and operating systems and over 90,000 lbs of new operating machinery and supports
  • Installed scour protection stone alongside the new precast concrete sheet wall in layers comprised of individual stones from 10 lbs. to 12,000 lbs
  • Demolished the existing boardwalk and installed precast concrete T-wall and concrete sheet pile retaining walls, and concrete sidewalk
  • Replenished the beach with 76,000 cubic yards of sand

Lean, Innovative, and Unique Project Solutions

This project required in-depth, extensive safety and environmental planning as the entire project was constructed in an environmentally sensitive area surrounded by three freshwater wetlands and two shell fishing areas. 