Scope of Work
Cianbro constructed three, GE 1.5 MW wind turbines in the town of Vinalhaven, located on Vinalhaven Island, Maine.

Project Details
  • Provided support to the owner through permitting, engineering and procurement of the turbines
  • Cleared the site
  • Constructed the site road
  • Placed the concrete foundations
  • Erected three, GE 1.5 MW wind turbines, including tower sections, nacelle, hub, and blades
  • Installed the collection and interconnect system
  • Installed the SCADA and communications system
  

Unique Challenge



Cianbro constructed the wind turbines on Vinalhaven Island approximately 12 miles off the coast of Maine. The location of the project required all construction materials and equipment to be barged to the island. In order to transport the 18 erection crane loads, 27 turbine loads, 30 concrete loads, and all the construction material and equipment to the project site requires precise logistics, including; scheduling and coordination with the owner, vendors, and transportation companies to ensure all material is transported in the most cost effective and safest way possible. Due to the size of Vinalhaven Island and how its economy depends on fishing and summer tourism, Cianbro worked closely with the community to mitigate any impacts that arose as it related to the project.

Project Information

Owner:
Fox Islands Wind, LLC

Type of Project:
Power & Energy

Construction Schedule:
Completed October 2009

Location:
Vinalhaven, ME
Copyright 2013 by The Cianbro Companies Contact Us | Plan Room Vendors & Suppliers  | Privacy Statement | Terms Of Use
  