Hollywood Slots Temporary Gaming Facility

Location:
Bangor, ME
Completed:
2005

Scope of Work

Cianbro served as Construction Manager to transform a 25,000-square-foot restaurant into a 475-slot gaming facility with a full kitchen, main bank, and an integrated state-of-the-art surveillance system.

Project Details

  • Demolished the existing interior walls, electrical, plumbing, restrooms, and kitchen equipment totaling 48, 40-yard dumpsters
  • Performed structural upgrades
  • Installed a hydraulic elevator between the basement and level one
  • Coordinated mechanical, sprinkler, plumbing, fire detection, and security trades above the ceiling in a low clearance area
  • Self-performed electrical and data services
  • Installed over 28 miles of data and power cabling within the ceiling cavity amongst the other trades in a tight space
  • Performed/installed millwork, cabinetry, door installations, teller areas, wood trim, and theming specialties
  • Installed acoustical ceilings, drywall ceilings, carpet, ceramic tile, and steel liner panels in secure rooms
  • Performed exterior modifications including painting, aluminum automatic entrance doors, 14 new HVAC units, refurbished the existing parking lot, installation of a kiosk, concrete entrance steps/ramps, and added new parking lights

Lean, Innovative, and Unique Project Solutions

The original structure was a two-story farmhouse built in the 1940s which underwent several additions over the course of 60 years. Areas throughout were up to three-inches out of plumb. This required precise planning to demolish and reframe the structure to ensure a quality facility.