Cianbro constructed an 8 inch wafer fabrication plant, which included a 550,000 sf facility with a 40,000 sf clean room.
Project Details
- Completed the site work and site infrastructure after demolishing existing buildings at the location
- Placed a mat slab of 21,000 cy of concrete
- Erected all structural steel, including trusses 220 ft long
- Performed final wipe down of the clean room
- Installed wafer fabrication tools within the clean room
- Erected metal form and roof decking, 8 inch core slabs, and precast wall panels